MAJOR CONTRACTS / 主要工程

MAJOR CONTRACTS / 主要工程

Construction of an overrun tunnel of the existing line with three underground stations.

The works include the construction of an 8.5m diameter and approximate 880m long and 100m below surface effluent tunnel.

A tunnel for a cross border bridge, connecting Hong Kong and China